Sign In | Join Free | My phrmg.org |
|
Brand Name : ABD
Certification : CE
Place of Origin : Guangdong, China
Price : Negotiate
Supply Ability : 10 Set/Sets per Month
Video outgoing-inspection : Provided
Showroom Location : Egypt, Canada, Turkey, United Kingdom, United States, Italy, France, Germany, Viet Nam, Philippines, Brazil, Peru, Saudi Arabia, Indonesia, Pakistan, Mexico, Russia, Spain, Thailand, Kenya, Argentina, South Korea, Chile, UAE, Colombia, Algeria, Sri Lanka,
Coating : Powder Coating
Applicable Industries : Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Marketing Type : Hot Product 2022
Heating power : natural gas, LPG, diesel oil
Machine Type : powder spray line, Spray Booths, Painting Equipment, Plc Controller Programmable Logic Controller, Pre-treatment Equipment, Conveying Equipment, Drying Oven, Curing oven, Coating Equipment
Keywords : powder coating plant
Technology : environmental protection
ABD PLC Control System Full-Automated Powder Coating Production Line Environmental Protection
Vertical Extrusion Aluminium Profile Powder Coating Production Line
*Full automatic control:Operation from the upload of original hanging profile to the download of finished coating profiles is completely automatic controlled.
*High productivity :As the requirement of customer,1000T/月---2500T/月
*Small area occupation:The occupied area of a 2000T/M coating line is W20m×L53m only.
*Low energy consumption :The square shape design of curing oven ensures the extreme high usage ratio of heat energy.
Save manpower:Automatic control ,reduce the manpower cost.
*Saving powder consumption:High efficiency for primary powder coating.Film thickness of workpieces is uniform,saving 15%powder comparing with horizontal powder coating system.
The seller will send the technician to provide the suggestions and advices of the installation, but the buyer is responsible for the air ticket cost, accommodation, meals and USD 100 / per day for each technician. If it causes extra charges during virus period, like quarantine hotel, food, test, local transportation and other costs, should be covered by the buyer.
The installation date of machine should be friendly discussed by the Buyer and the Seller.
Time: manufacture: 4 months. Installation and test: 2 months.
The valid date of this quotation is 3 months since provided.
Payment: 100% TT, at sight. (Within 14 days after the date of contract signature, 30% of the full contract amount should be released from the TT to the Seller’s beneficial account. When the shipment is ready, 65% of the full contract amount should be released from the TT to the Seller’s beneficial account. Within 30 days after the machine is installed and commissioned, 5% of the full contract amount should be released from the TT to the Seller’s beneficial account.)
1. We have been producing powder coating products for more than 9 years, and we have exported to more than 40 nations.
2. Before you make the balance payment, we will perform the pre-installation, as shown in the illustration below. You can organize the payment in a more secure manner in this manner. Additionally, by being aware of the equipment's installation procedures before it arrives, you will find it much easier to complete the installation.
Q1:Are you manufacturer?
V Type Booth Full-automatic Spraying Gun Vertical Powder Coating Line Images |